PROJECT STATUS
Design 100% complete, currently in review with the State prior to going out to bid.
PROJECT SUMMARY
Infrastructure has been awarded a Community Development Block Grant (CDBG) to aid in funding a drainage project for the Hymon Circle community.
This project would install underground storm conveyance pipes and catch basins along both sides of Hymon Circle allowing rainwater to properly drain instead of consistently flooding the residents’ front yards. Also, included in this project would be the clearing and widening of the main drainage canal running from E. Short St. and Hymon Circle south along US1 to our MS4 outfall.
This will increase drainage capacity for the entire south eastern quadrant of the city.
Finally, a dirt service road would be constructed to access the canal for future maintenance by the City.